|
|||||||||||||
Scanning Floor Before Drilling At Sub-Station GPRS of Michigan recently completed a job at the AT&T sub-station in Okemos, MI to scan one small are prior to the contractor coring two 4in holes. GPRS needed to locate any rebar running in the slab so that the contractor didn’t hit any steel while they were drilling through the floor. Even with the area being relatively small, these locations are sensitive and having areas like this scanned before the work is performed was a good call for the contractor to make.
|